Item A technical report on the galaxy gold mine Mpumalanga province, South Africa(Minxcon (Pty) Ltd, 2015) Minxcon (Pty) LimitedThis Report titled “A Technical Report on the Galaxy Gold Mine, Mpumalanga Province, South Africa” was prepared on behalf of Galaxy Gold Mining Limited. The Report is compliant with National Instrument 43-101 and Form 43-101 F1.Item Elandsfontein colliery existing underground workings subsidence investigation report(Geomech Consulting (Pty) Ltd, 2020) Geomech Consulting (Pty) LtdA rock engineering investigation has been conducted to assess the risks of surface subsidence and sinkhole formation in the Elandsfontein Colliery mining area as a result of the existing underground mine workings on the No. 1 Seam. Underground mining has been conducted extensively at Elandsfontein to date, however, there remain significant No. 1 Seam reserve areas which may be exploited either via underground or opencast mining methods in future. The No. 1 Seam is typically overlain by the No. 2 Seam which, to date, has only be exploited via opencast mining methods due to its relatively shallow depth across the mining area as well as the weak nature of the Shale layer which typically forms the immediate roof on the No. 2 Seam. This report serves to document the findings of the subsidence investigation report.Item NI 43-101 technical report and feasibility study for Asanko Gold Mine, Ghana(SRK Consulting (Canada) Inc., 2023) SRK Consulting (Canada) Inc.This report was prepared as a Technical Report for Galiano Gold Inc. (Galiano) by SRK Consulting (Canada) Inc. as part of a team of consultants (“the Team”) contracted by Galiano. The quality of information, conclusions and estimates contained herein is consistent with the level of effort involved in the Team’s services, based on: i) information available at the time of preparation, ii) data supplied by outside sources, and iii) the assumptions, conditions, and qualifications set forth in this report. This report is intended for use by Galiano subject to the terms and conditions of its contracts with SRK and the Team and to the relevant securities legislation. The contracts permit Galiano to file this report as a technical report with relevant securities regulatory authorities. Except for the purposes legislated under provincial securities law or for litigation or dispute resolution, any other uses of this report by any third party are at that party’s sole risk. The responsibility for this disclosure remains with Galiano. The user of this document should ensure that this is the most recent Technical Report for the property as it is not valid if a new technical report has been issued.Item Schurvekop feasibility study rock engineering report(Metallurgical Resources Consulting (Pty) Ltd, 2017) Lees, D.In this report, the recommended minimum systematic support and pillar dimensions have been detailed per mining area along with the anticipated amounts of contamination. Challenges are expected in areas in which the roof and floor strata as well as the coal seam itself are impacted on by the effects of dolerite intrusions. The minimum mining depth cutoff which has been applied in this investigation is 20 m. Although areas in which the mining seam lies at depths of between 20 m and 30 m are deemed to be potentially minable based on the available geological and geotechnical information, it is recommended that additional drilling and geotechnical testing be conducted in these areas to verify the rockmass properties of the overburden before mining is conducted in them. Since multiseam mining will be conducted in a significant portion of the Schurvekop project area, the design guidelines for multiseam mining must be complied with. As a result, it has been found that the barrier pillars on the No. 4 Lower Seam and No. 2 Seam in the northern portion of the project area will have to be superimposed. Additional investigations using numerical modeling techniques could be conducted to confirm / refute the need to superimpose the barrier pillars on the Two (2) seams in this portion of the project area.