Mining Engineering
Permanent URI for this collection
Browse
Browsing Mining Engineering by Subject "Rock mechanics"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item Elandsfontein colliery existing underground workings subsidence investigation report(Geomech Consulting (Pty) Ltd, 2020) Geomech Consulting (Pty) LtdA rock engineering investigation has been conducted to assess the risks of surface subsidence and sinkhole formation in the Elandsfontein Colliery mining area as a result of the existing underground mine workings on the No. 1 Seam. Underground mining has been conducted extensively at Elandsfontein to date, however, there remain significant No. 1 Seam reserve areas which may be exploited either via underground or opencast mining methods in future. The No. 1 Seam is typically overlain by the No. 2 Seam which, to date, has only be exploited via opencast mining methods due to its relatively shallow depth across the mining area as well as the weak nature of the Shale layer which typically forms the immediate roof on the No. 2 Seam. This report serves to document the findings of the subsidence investigation report.Item Schurvekop feasibility study rock engineering report(Metallurgical Resources Consulting (Pty) Ltd, 2017) Lees, D.In this report, the recommended minimum systematic support and pillar dimensions have been detailed per mining area along with the anticipated amounts of contamination. Challenges are expected in areas in which the roof and floor strata as well as the coal seam itself are impacted on by the effects of dolerite intrusions. The minimum mining depth cutoff which has been applied in this investigation is 20 m. Although areas in which the mining seam lies at depths of between 20 m and 30 m are deemed to be potentially minable based on the available geological and geotechnical information, it is recommended that additional drilling and geotechnical testing be conducted in these areas to verify the rockmass properties of the overburden before mining is conducted in them. Since multiseam mining will be conducted in a significant portion of the Schurvekop project area, the design guidelines for multiseam mining must be complied with. As a result, it has been found that the barrier pillars on the No. 4 Lower Seam and No. 2 Seam in the northern portion of the project area will have to be superimposed. Additional investigations using numerical modeling techniques could be conducted to confirm / refute the need to superimpose the barrier pillars on the Two (2) seams in this portion of the project area.